South London
Woolwich, SE18
A full bathroom renovation in south east London, delivered in two weeks for a contract value of £12,000.
The project
This was a full strip-out and rebuild rather than a cosmetic refresh. The existing room was taken back to the substrate so the layout, the services and the waterproofing could all be addressed properly rather than worked around.
At £12,000 and two weeks on site, this was a compact room finished to a high specification. Holding the layout like-for-like keeps both the cost and the disruption down, without changing how the waterproofing and first fix are done — the budget goes into what you can see.
What was involved
Strip-out and disposal, first fix plumbing and electrics, waterproofing to wet areas, full tiling, sanitaryware and brassware installation, glazing, and decoration. Everything was commissioned and tested as it went in, and the room was snagged by us before handover.
Specification
- Location
- Woolwich, London SE18
- Contract value
- £12,000
- Time on site
- 2 weeks
- Property type
- Purpose-built flat
- Scope
- Full bathroom refit on the existing footprint — old suite stripped out, services renewed, wet areas tanked, full tiling, sanitaryware and brassware set, snagged and handed over clean.
- Finishes
- Large-format grey and gold marble-effect tiling to walls and floor, with a gold trim course. Quadrant sliding enclosure with multi-function shower panel and body jets, smart WC with heated seat and digital display, teal wall-hung vanity with brushed gold handles, gold basin mixer, and an LED-lit three-door mirrored cabinet.
Before & after
Gallery
Next project
Streatham, SW16
Planning something similar?
Get an indicative range in about a minute, or book a free survey and we'll come back with a fixed price in writing.